Search
CN

News

Liaoyang Petrochemical: Adapting to the Seasons to Ensure the Production of Low Pour Point Diesel

14

2025-11

Liaoyang Petrochemical: Adapting to the Seasons to Ensure the Production of Low Pour Point Diesel

As temperatures in Northeast China continue to drop, the pressure to ensure a steady supply of low pour point diesel has been

The automatic pipe pusher device of the Downhole Operations Company of Dagang Oilfield reduces burde

07

2025-11

The automatic pipe pusher device of the Downhole Operations Company of Dagang Oilfield reduces burde

On November 3rd, at the well maintenance site of Well West 17-9 in the Downhole Operations Company of Dagang Oilfield, employ

The Liaohe Oilfield has put a new device into use, reducing the comprehensive cost per ton of liquid

31

2025-10

The Liaohe Oilfield has put a new device into use, reducing the comprehensive cost per ton of liquid

On October 28th, it was learned from Liaohe Oilfield that after the Shu 5 Combined Station of the oilfield adopted the new-ge

Jidong Oilfield Develops a New Type of Filter Core Carbonization Cleaning Device to Reduce Costs and

24

2025-10

Jidong Oilfield Develops a New Type of Filter Core Carbonization Cleaning Device to Reduce Costs and

On October 22nd, at the Laoyema Joint Station of the Oil and Gas Gathering and Transportation Company of Jidong Oilfield, emp

Daqing Oilfield develops wide-area tracer logging technology

11

2025-10

Daqing Oilfield develops wide-area tracer logging technology

On September 7th, the reporter learned from the Testing Technology Service Branch of Daqing Oilfield that its successfully de

The digital transformation of BaiKouQuan Oil Production Plant in Xinjiang Oilfield has achieved qual

26

2025-09

The digital transformation of BaiKouQuan Oil Production Plant in Xinjiang Oilfield has achieved qual

As of now, the Internet of Things (IoT) online rate of the BaiKouQuan Oil Production Plant in Xinjiang Oilfield has remained

The Dagang Oilfield has adopted differentiated water injection to tap the potential of remaining oil

19

2025-09

The Dagang Oilfield has adopted differentiated water injection to tap the potential of remaining oil

As of September 10th, Dagang Oilfield has carried out differentiated water injection management in 40 key blocks, achieving a

Jilin Oilfield's Closed Core Sampling Guides the Potential Exploration in the Old Area

29

2025-08

Jilin Oilfield's Closed Core Sampling Guides the Potential Exploration in the Old Area

Since the beginning of this year, Daqing Petrochemical Company has been adjusting the material flow in the oil refining area

The Changqing Heshui Oilfield Accelerates the Profitable Development of Tight Oil

08

2025-08

The Changqing Heshui Oilfield Accelerates the Profitable Development of Tight Oil

On August 5th, with the successful completion of a horizontal well at the Guping 41-52 well site, the number of wells in the

Tuha Oilfield: Accelerate Technological Innovation to Reduce Drilling and Fracturing Costs

25

2025-07

Tuha Oilfield: Accelerate Technological Innovation to Reduce Drilling and Fracturing Costs

As of now, the Tuha Oilfield has completed 46 various plans for capacity construction and other aspects this year, with the d


Add:Luweidao No.1st. Balitai Industry (south)Zone, Jinnan Disct., Tianjin,China.
Tel:+86-22-26551000
Fax:+86-22-26262619
http://www.kzm-valve.com
E-mail:kzm@kzm-valve.com
Tel:+86-22-26551000

Whatsapp scan